Skip to content Skip to footer

Countdown to Bali, Indonesia on 5-7 February, 2025

The Global Conference for CLC Projects & Cross Ocean Starts in:

Malaysia member Tera Projects – Shifting of Yacht Within Wharfside

Tera Logo for emailTera Projects & Shipping organised the transfer of a Yacht within Westport for OOCL Malaysia

Origin: Westport, Malaysia
Destination: Kobe, Japan
Mode: Breakbulk (UC on Container Vessel)
Total: 2 Packages / 715.3 M3 / 38 MT
Scope of Work: Tera Projects were appointed by OOCL Malaysia as their nominated transporter to transfer 1 unit yacht within wharf area. The yacht measured 19.30 long x 5.03 wide x 6.80 high.

The yacht was lifted from water using port gantry crane and secured together with its cradle before it was loaded onto our vessel bridge trailer. And then chain-blocks were used to secure the load onto our trailer before the shifting take place. Upon arriving at the shipside, the chain-blocks were removed and the yacht was lifted using port gantry crane and loaded onto OOCL container vessel. The whole operation was completed in under 6 hours.

View profile: Tera Projects & Shipping Sdn. Bhd.
View website: http://www.teraprojects-shipping.com/

 

Case-Study---Shifting-of-Yacht-Within-Wharfside-9

Case-Study---Shifting-of-Yacht-Within-Wharfside-7

Case-Study---Shifting-of-Yacht-Within-Wharfside-4

Case-Study---Shifting-of-Yacht-Within-Wharfside-2

Go to Top