Each shipment consists of 2 main modules (21m x 14.30m x 9.70m(H) / 160ton per module) and some loose parts.
For transporting each shipment, Shin-Jo Logitech’s scope is as follows;
- Engineering for load out / sea-fastening / grillage
- Loading by SPMT (24 axles) for each module, and by forklift for loose parts (using SOCs)
- Jack down modules on the barge by hydraulic jack devices
- Sea-fastening & grillage on the barge
- Arranging barge from Korea to private jetty at Ilijan project site
- Insurance arrangement for barging transportation
Shin-Jo Logitech is a member of CLC Projects representing South Korea
View Profile: Shin-Jo Logitech Co. Ltd.
View Website: http://www.sjl21.com/