The uneven load distribution of the Lathe Machine the clearance level of the room being ~ 7 meters made crane operations impossible.
Shifting operation was conducted using a two-point lifing system up to the point where the space could be made for the positioning using a four point lifting system.
The final shifting, placement and alignment was done using a four-point lifting system.