A full charter of around 4500-5000 Freight tonnes was arranged by the Abnormal Load Services (ALS) operations team in Germany.
The shipment of 36 pieces of wind equipment (729 tons) was from Bremerhaven Labradorhafen (ADWEN) up to Esbjerg Denmark (Siemens) for an offshore wind project.
Heaviest piece – Triebstrang – 170 tons.
Biggest Pieces were Rotorstacks which were 8.40 meters in height.
Scope of Work:
- Vessel Charter
- Shipping
- Transportation
- Permits
WWL ALS (Belgiƫ) Bvba is a member of CLC Projects representing Belgium
View Profile: WWL ALS (Belgiƫ) Bvba
View Website: http://www.abnormal-loads.com/