Aaras Pakistan latest projects January 2016

Pakistan member Aaras Shipping Agencies Private Limited (view profile) recently completed 3 projects. Photos featured below.

The total weight of the cargoes that were discharged by Aaras’ stevedores was around 39,905.420 metric tons. Most of the units were heavy and oversized.

Project 1:

MV. “KSL ANYANG” Consisted 2,294 Packages Of Multiple Projects.

Power Generation Project Cargo:

  • 22 Packages Of Machinery, Construction Equipment & Parts For 1410 Megawatts Tarbela Dam 4th Extension Hydropower Project In Khyber Pakhtunkhwa.
  • Partial Shipment Of Hydraulic Inlet Section For Turbines
  • 31 Packages Of 132KV Main Transformer 28th Partial Shipment Of Machinery, Material,
  • Equipment And Essential Accessories For Delivery Of 100MW Solar PV Power Project In Quaid-E-Azam Solar Park Cholistan Punjab
  • 494 Packages Of Complete Coal Firing System For 30 MW Coal Fired Power Plant With Standard Accessories And Essential Parts For M/S. D.G. Khan Cement Company Limited
  • 133 Packages Of Auto Transformer (160 MVA) Complete With Standard Accessories For Designing, Manufacturing, Supplying, Installation, Testing And Commissioning Of Plant & Equipment For Dera Murad Jamali 220/132/11KV Substation For M/S. National Transmission And Dispatch Company (NTDC)

Industrial Project Cargo

  • Includes 04 Packages Of Cryogenic Liquid Gas Vertical Tank 250 M3, Bar Model – ZCF-250000/4(250M3) With All Necessary Components Parts And Accessories For M/S. Ghani Gases Limited
  • 1 Packages Of Old & Used (SANY) Mobile Concrete Pump For Ms. Paragon Construction (Pvt.) Limited
  • 1 Unit Used Kato 20T Truck Crane For M/S. Worldwide Construction (Pvt.) Limited
  • 15 Units Of Buses For M/S. Master Motor Corporation (Pvt.) Limited

The Remaining Space On The Vessel Was Taken Up With Metal Cargo


Project 2:

MV. “AMBER BEVERLY” Consisted 6711 Packages With Total Weight 16,055.008 MTons Approx.

Project Cargo Included:

  • 18 Packages 12th Partial Shipment Of Machinery & Equipment For 18 Megawatt Power Generation Project Comprising Of Extraction Cum Condensing Steam Turbines And CFB Type Boiler Complete With Auxiliary, Equipment And Accessories For SODA Ash Plant At KHEWRA Belonging To M/S. ICI Pakistan Limited
  • 748 Packages Of Construction Materials Comprising Dumper Lorry, Deformed Steel Bar, Steel ROD, Seamless Pipe, Welded Steel Tube Etc, Belonging To M/S. Pakistan Atomic Energy Commission
  • The Remaining Space On The Vessel Was Taken Up With Metal Cargo

Project 3:

MV. “CHANG HANG FAN HAI” Consisted of 6058 Packages With Total Weight 12,360.705 MTons Approx.

Project Cargo Included:

  • 156 Packages Of Machinery & Equipment For 2X660 Megawatt Coal Fired Power Project Comprising Crawler Crane, Mobile Crane, Gantry Crane, Screw Air Compressor, Inverter Air Plasma Cutting Machine, Magnetic Pipe Cutting Machine, Flame Cutting Machine Etc, For The Project Of M/S. Huaneng Shandong Ruyi (Pakistan) Energy (Pvt.) Limited
  • 42 Packages/One Unit Complete 20 Megawatt Waste Heat Recovery Power Plant For 6700TPD Cement Plant With All Standard Equipment And Accessories (Partial Shipment) for M/s. Gharibwal Cement Limited
  • The Remaining Space On The Vessel Was Taken Up With Metal Cargo

Photos from the 3 recent projects handled by Aaras