Below is a brief report on a project handled by Fast Logistics:
Project Name: Doha Link Project – Sheikh Jaber Al Ahmad Al Sabah Causeway
Fast Project Coordinator: Mr. Mathew John
Location: 43 KMs from port
PROJECT SCOPE:
- Transportation of Cranes and bridge building equipments
- Moved from Shuwaikh Port to Doha Link Project site.
- 850T Straddle Carrier – 161 Packages 1358410 Kgs / 5272.81 Cbm. Equipment used 14 flat beds and 39 Low beds.
FAST LOGISTICS SCOPE OF WORK:
- Being over size and overweight with odd cargo size, equipments had to be pre arranged and organized accordingly for loading coordinating with the shipper.
- Road survey was conducted on bridges, highway and in line with the heavy load vehicle timings, with the coordination of the traffic department and Ministry of Interior for smooth movement of our trailers’ from port to site.
- Meeting the deadline of the project is our core responsibility.
Summary:
Thanks to the years of experience in handling projects. Execution and planning for this project with international parties and local authorities and eliminating all obstacles, took 3 working days to move 1358410 Kgs / 5272.81 Cbm. This project has added another feather to Fast Logistics’ cap, while expecting more of such projects